Exterior polymer-based brick building material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9677270
SERIAL NO

15351566

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A simulated brick includes a polymeric core member, a mesh layer adhered to the core member, a basecoat layer covering an entirety of the mesh layer, and a finish layer covering an entirety of the basecoat layer. The core member, the mesh layer, the basecoat layer, and the finish layer together define a brick profile portion having first and second lateral sides extending to a planar outer surface to define a first thickness, and an offset portion extending from the first lateral side of the brick profile portion to a lateral end surface and having an outer surface defining a second thickness smaller than the first thickness, the brick profile portion and the offset portion together defining a planar rectangular base surface extending from the second lateral side of the brick profile portion to the lateral end surface of the offset portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TREMCO ACQUISITION LLC3735 GREEN ROAD BEACHWOOD OH 44122

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lombardi, Robert West Greenwich, US 7 57
Preston, William Johnston, US 6 32
Serino, Roland East Greenwich, US 7 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00