Method and device for producing a ply involved in the construction of a multi-ply panel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9676117
APP PUB NO 20150233117A1
SERIAL NO

14398972

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is a method for producing a ply involved in the construction of a multi-ply panel for constructing or adding to a wall, floor or ceiling, or a sloping part for a building. The ply includes a juxtaposition of strips, either structural strips or filling strips, positioned between the structural strips and made of a different material from that of the structural strips. The materials are selected for the thermal or acoustic insulation thereof, the thermal inertia thereof or the fire résistance thereof. Each lateral movement of a ply being produced with respect to the assembly plane is carried out by the synchronized movement of a table with which the lower face of the ply is in contact and a driver with which the upper face of the ply is in contact. There is an installation for implementing the method according to the invention.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECHNIWOOD74150 RUMILLY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chabrier, Christian La Balme de Thuy, FR 6 16
Faure, Pascal Ugine, FR 3 1
Raudin, Bruno Les Gonds, FR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00