Electronic throttle control pedal assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9671815
SERIAL NO

14505572

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pedal assembly having a hysteresis creating configuration in communication with a sensor of a pedal assembly. The assembly includes a housing and a pedal arm wherein the pedal arm is pivotally mounted by bushings to the housing. A connector and sensor assembly is provided connected through the pivot point (hub) where the pedal arm connects to the housing of the pedal assembly. A spring connects to a spring carrier wherein the spring is depressed upon depression of the pedal arm of the pedal assembly. As the spring applies a force to the spring carrier, the spring carrier slides down an inclined wall and applies a force to a friction shoe. The friction shoe is in contact with the generally circular hub of the pedal arm thus providing a hysteresis effect as the friction shoe contacts the hub of the pedal arm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KSR IP HOLDINGS LLC95 ERIE STREET SOUTH RIDGETOWN ONTARIO N0P 2C0

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fuller, Shaun Matthew Ridgetown, CA 3 37
O'Neill, Dan Chatham, CA 26 188

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00