Adhesive compositions and use thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9670390
APP PUB NO 20150013878A1
SERIAL NO

14374053

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to new formulations for adhesive compositions and also to adhesive compositions particularly for a hybrid adhesive comprising at least one mixture of an amino resin and at least one polyether, and the combination of this mixture with isocyanate, and also to the use of polyethers in adhesives based on amino resins. These adhesive compositions are especially suitable for use as adhesives for woodbase materials, more particularly OSB boards, fiberboards, or chipboards. In a further aspect the present invention relates to processes for producing such woodbase materials from lignocellulosic products of comminution, more particularly to processes for producing OSB boards, wood fiberboards, or chipboards, where the lignocellulosic products of comminution are contacted with the adhesive composition of the invention and subsequently the woodbase materials are obtained by pressing with heat treatment. Lastly, the present invention is directed to woodbase materials obtainable accordingly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SWISS KRONO TEC AGMUSEGGSTRASSE 14 6004 LUZERN 6004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kalwa, Norbert Horn-Bad Meinberg, DE 75 328

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00