Bicycle frame assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9669890
SERIAL NO

14298546

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bicycle frame assembly is formed of a head tube, a seat tube, a linking member, and a support holder. The linking member includes a first part, two second parts, and two positioning parts. The first part is connected with the seat tube. The two positioning parts are spaced from each other and extend in an interval toward the head tube from the first part to jointly form a limiting portion therebetween. The two second parts are connected with the head tube and located between the head tube and the two positioning parts. The support holder is movably mounted to the limiting portion relative to the linking member for accommodating a portable part or accessory. Therefore, the present invention facilitates that the rider can take or put the portable part or accessory from or into the support holder with his or her natural riding posture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GIANT (KUNSHAN) CO LTDNO 889 HONGHU ROAD KUNSHAN ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE SUZHOU CITY JIANGSU PROVINCE 215300 SUZHOU CITY JIANGSU PROVINCE 215300

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Jack Taichung, TW 182 1931

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00