Method and apparatus for collecting carbon dioxide from flue gas

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9669354
APP PUB NO 20140301929A1
SERIAL NO

14311379

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for collecting carbon dioxide from flue gas of a power plant. The method includes: 1) mixing an organic amine, an ionic liquid, and water to obtain an aqueous solution of a composite absorbent; 2) spraying the aqueous solution of the composite absorbent into the flue gas to allow the flue gas flowing upwardly to fully contact with the downwardly sprayed aqueous solution of the composite absorbent and to allow CO2 in the flue gas to react with the composite absorbent to yield a solution rich in A.CO2 and B.CO2, where A represents the organic amine and B represents the ionic liquid; allowing the solution rich in A.CO2 and B.CO2 to stand and clarify to form different liquid layers; 3) thermally decomposing the mixed solution rich in A.CO2 and B.CO2 after heat exchange to release the chemically bound CO2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WUHAN KAIDI GENERAL RESEARCH INSTITUTE OF ENGINEERING & TECHNOLOGY CO LTDKAIDI BUILDING T1 JIANGXIA AVENUE EASTLAKE NEWTECH DEVELOPMENT ZONE WUHAN 430223

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Zhilong Wuhan, CN 27 514
Zhang, Yanfeng Wuhan, CN 177 515

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00