Method for producing a housing enclosing at least one component under pre-tension

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9668392
APP PUB NO 20140165381A1
SERIAL NO

14127986

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a housing structure at least partially enclosing at least one component, wherein the housing structure is produced with a construction process utilizing at least one of repeated layered deposition and solidification of material, which is interrupted at least once before completion of the housing structure, and during at least one interruption at least one component, which is not produced by the construction process, is joined to or disposed in a partially finished housing structure, and the construction process is then continued after the interruption until the housing is completed, wherein at least one of an actuator and sensor comprising at least partially a transformer material selected as the at least one component to be joined to or disposed in the housing structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FRAUNHOFER-GESELLSCHAFT ZUR FORDERUNG DER ANGEWANDTEN FORSCHUNG E V80686 MÜNCHEN
TECHNISCHE UNIVERSITAET DARMSTADTKAROLINEPLATZ 5 DARMSTADT D-64289

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abele, Eberhard Buehl, DE 2 9
Fischer, Jakob Engenhahn, DE 19 344
Flaschentraeger, David Darmstadt, DE 1 6
Melz, Tobias Darmstadt, DE 32 258
Rauschenbach, Matthias Darmstadt, DE 1 6
Stoffregen, Hanns Frankfurt, DE 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00