Controlling airflow within an explosion-proof enclosure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9668385
SERIAL NO

13331331

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system is described herein. The system can include an explosion-proof enclosure having an interior comprising a first region and a second region. The system can also include a heat-generating component positioned within the second region of the explosion-proof enclosure. The system can further include an air moving device positioned within the first region of the explosion-proof enclosure. The air moving device can draw a first portion of intake air from outside the explosion-proof enclosure. The air moving device can also pass the first portion of the intake air over the heat-generating component to generate first exhaust air, where the first portion of the intake air cools the heat-generating component. The air moving device can further remove the first exhaust air from the interior of the explosion-proof enclosure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITED30 PEMBROKE ROAD DUBLIN 4

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
DeCarr, Graig E Cicero, US 13 264
Manahan, Joseph Michael Manlius, US 119 1109

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00