Portable cable assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9666976
SERIAL NO

15172138

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A portable cable assembly includes a first connection port, a second connection port, a cable, an absorptive element, a shell and a sleeve. The first connection port has a first base portion and a first mating portion, the first base portion defines a containing groove in an outer surface thereof. The second connection port has a second base portion and a second mating portion. Two ends of the cable are connected with the first base portion and the second base portion. the absorptive element is accommodated in the containing groove. The shell surrounds the first base portion and the absorptive element. The sleeve is capable of sliding to sleeve the first connection port and the second connection port therein, and the sleeve can be absorbed on the shell by the absorptive element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHENG UEI PRECISION INDUSTRY CO LTDNEW TAIPEI CITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Gen-Yuan New Taipei, TW 17 159
Jan, Shuo-Yuan New Taipei, TW 3 5
Kuo, Shou-Fu New Taipei, TW 2 4
Tsai, Kun-Wei New Taipei, TW 26 680

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00