Solid oxide fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9666885
SERIAL NO

14342952

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid oxide fuel cell system (10) comprises a solid oxide fuel cell stack (12) and a gas turbine engine (14). The solid oxide fuel cell stack (12) comprises a plurality of solid oxide fuel cells (16). The gas turbine engine (14) comprises a compressor (24) and a turbine (26). The compressor (24) supplies oxidant to the cathodes (22) of the fuel cells (16) via an oxidant ejector (60) and the oxidant ejector (60) supplies a portion of the unused oxidant from the cathodes (22) of the fuel cells (16) back to the cathodes (22) of the fuel cells (16) with the oxidant from the compressor (24). The fuel cell system (10) further comprises an additional compressor (64), an additional turbine (66), a cooler (70) and a recuperator (72). The compressor (24) supplies oxidant via the cooler (70) to the additional compressor (64) and the additional compressor (64) supplies oxidant to the oxidant ejector (60) via the recuperator (72). The solid oxide fuel cell stack (12) supplies exhaust gases to the turbine (26) and the turbine (26) supplies the exhaust gases through the recuperator (72) to heat the oxidant flowing through the recuperator (72).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ELECTRONICS INC128 YEOUI-DAERO YEONGDEUNGPO-GU SEOUL 07336

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Balestrino, Cristiano Lasalle, CA 4 39
Bozzolo, Michele Genoa, IT 21 122

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00