Internal current collection structure of thermal to electric converting cell and manufacturing method of the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9666377
APP PUB NO 20150010787A1
SERIAL NO

13961911

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is an internal current collection structure of a tubular thermal to electric converting cell including an internal electrode, a solid electrolyte and an external electrode. The internal current collection structure includes: a first current collector which closely contacts with the internal electrode of the tubular thermal to electric converting cell; a second current collector which fixes the first porous current collector to the inside of the tubular thermal to electric converting cell and causes the first current collector to be in close contact with the internal electrode; and a lead wire which is a conductive medium and is located between the first current collector and the second current collector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA INSTITUTE OF ENERGY RESEARCHDAEJEON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Han, In-Sub Daejeon, KR 23 34
Joo, Jong-Hoon Chungcheongbuk-do, KR 10 3
Kim, Se-Young Seongnam-si, KR 43 140
Kim, Sun-Dong Daejeon, KR 25 85
Seo, Doo-Won Daejeon, KR 23 34
Suh, Min-Soo Daejeon, KR 12 6
Woo, Sang-Kuk Daejeon, KR 22 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00