Method and apparatus for forming oriented nanowire material and method for forming conductive structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9666339
APP PUB NO 20160225491A1
SERIAL NO

15096745

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method and an apparatus for forming an oriented nanowire material as well as a method for forming a conductive structure, which can be used to solve the problem of imperfect process for forming oriented nanowire material in prior art. The method for forming an oriented nanowire material of the present invention comprises: forming a liquid film in a closed frame by a dispersion containing nanowires; expanding the closed frame in a first direction so that the liquid film expands in the first direction along with the closed frame; contracting the closed frame in the first direction so that the liquid film contracts in the first direction along with the closed frame; transferring the contracted liquid film to a substrate; and curing the liquid film to form an oriented nanowire material on the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOE TECHNOLOGY GROUP CO LTD100015 NO 10 JIUXIANQIAO ROAD BEIJING CHAOYANG DISTRICT BEIJING CITY BEIJING CITY 100015
BEIJING BOE OPTOELECTRONICS TECHNOLOGY CO LTDNO 8 XIHUANZHONGLU BDA BEIJING 100176

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bai, Feng Beijing, CN 133 718
Liu, Zhen Beijing, CN 414 5359
Ren, Tao Beijing, CN 89 589
Wang, Ruiyong Beijing, CN 21 26
Zhao, Yiming Beijing, CN 59 379

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00