Ocean thermal energy conversion pipe connection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9664306
APP PUB NO 20150285403A1
SERIAL NO

14435718

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of assembling a pipe on a water-supported floating platform is provided. The platform includes an open central bay, and a gantry on the platform is arranged so as to surround at least a portion of the bay. The method includes providing a pipe intake assembly and staves on the platform; transferring the pipe intake assembly to the interior space of the bay; assembling the individual staves on the pipe intake assembly in an offset construction; lowering the pipe portion within the bay and into the water until the upper ends of the staves reside within a lower portion of the gantry; increasing the length of the pipe portion by assembling additional staves to the upper ends of the assembled staves; and repeating the step of increasing the length of the portion of the pipe until the pipe has a desired length.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE ABELL FOUNDATION INC111 S CALVERT STREET SUITE 2300 BALTIMORE MD 21202-6174

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cole, Barry R Mineral, US 27 193
Ross, Jonathan M Arnold, US 18 140
Shapiro, Laurence Jay Baltimore, US 27 223

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00