Flow control valve for a hand held bidet shower

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9664294
SERIAL NO

14431630

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The control valve (R) comprises a body (10) having: an outlet nozzle (12) connected to a flexible conduct (20) whose outlet end (22) is connected to a pistol (30); a sealing seat (S); and a movable sealing means (V) to be displaced between closing and opening positions of the seat (S). A rod (90) has an inner end (91) coupled to the movable sealing means (V), an outer end (92), and a median region (93) mounted in the body (10). The rod (90) may be displaced, in a vertical plane and around a median transversal axis, so as to have its outer end (92) conducted to lowered and raised positions, in which the movable sealing means (V) is conducted to the closing and opening positions of the seat (S). A support (100) is provided in the outer end (92) of the rod (90), in order to receive and retain the pistol (30) when in an inoperative condition, producing the closing of the control valve (R).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FABRIMAR S/A INDUSTRIA E COMERCIOROD PRESIDENTE DUTRA 1362 E 2290 RIO DE JANEIRO - RJ 21535-500

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ramos, De Barros Carlos Augusto Rio de Janeiro, BR 2 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00