Monitoring of multilayer reservoirs

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9664035
APP PUB NO 20150176396A1
SERIAL NO

14412040

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system is described for estimating flow rates of fluids from each of separate influx zones in a multilayered reservoir to a production flow (Q) in a well (Wr) in the reservoir, the well having at least two separate influx zones from the multilayer reservoir of known positions along the well, the well being provided with distinct tracer sources with distinct tracer materials of known positions in each of the at least two separate influx zones. Each influx zone is provided with a delay path for a tracer leakout stream flow from that influx zone. The method includes providing a global production flow change for the production flow in the well, establishing tracer concentrations in the production flow of the distinct tracer materials as a function of time, and estimating the production rates from each of the separate influx zones in the reservoir.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESMAN ASSTRINDFJORDVEGEN 1 RANHEIM 7053

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nyhavn, Fridtjof Trondheim, NO 22 112

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00