Textile-reinforced concrete component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9663950
SERIAL NO

14402769

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A concrete component includes a fiber reinforcement structure (12), formed by a grid arrangement (15). At least some of the rods extending in the X or Y direction are preferably designed as double rods having a joined cross-section or having sub-cross-sections separated from each other by a gap (20). Such double rods can be arranged in a grid structure both at right angles to each other and at other angles to provide a triangular structure, a hexagonal structure, or the like as a grid. Fiber reinforcement structures (12) made of a plastic-impregnated fiber material, such as epoxy-resin-bonded glass fibers having long fibers (endless fibers), in the particular rod longitudinal direction and without bonding among each other (ravings) can construct an adequately load-bearing composite with the concrete body (II). The steel rods can act as reinforcement, wherein harmful effects on the concrete, in particular wedge and gap effects, do not occur.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLIDIAN GMBHSIGMARINGER STR 150 ALBSTADT 72458

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Karle, Roland Bisingen, DE 5 19
Kromer, Hans Winterlingen, DE 5 19
Pfaff, Johann Winterlingen, DE 10 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00