Producing propylene impact copolymers and products

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9663647
SERIAL NO

15035980

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing a propylene impact copolymer (ICOP), the process comprising the steps of feeding propylene and optionally one or more first comonomers into a first reactor; feeding into the first reactor a catalyst mixture; contacting the propylene with the catalyst mixture under first polymerization conditions to form an active propylene-based polymer; transferring at least a portion of the first reactor contents to a second reactor; feeding additional activity limiting agent, additional selectivity control agent and, optionally additional cocatalyst and one or more second comonomers into the second reactor; and maintaining the second reactor at a second reactor temperature in a range that is sufficient to allow copolymerization to form the propylene impact copolymer (ICOP), wherein the second reactor temperature is below 70° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
W R GRACE & CO -CONN7500 GRACE DRIVE COLUMBIA MD 21044

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goad, Jeffrey D Barboursville, US 13 123
Van, Egmond Jan W Charleston, US 21 87

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00