Process for producing biopolymer nanoparticles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9662824
APP PUB NO 20110042841A1
SERIAL NO

12377501

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing a biopolymer nanoparticles product is disclosed. In this process, biopolymer feedstock and a plasticizer are fed to a feed zone of an extruder having a screw configuration in which the feedstock is process using shear forces in the extruder, and a crosslinking agent is added to the extruder downstream of the feed zone. The biopolymer feedstock and plasticizer are preferably added separately to the feed zone. The screw configuration may include two or more steam seal sections. Shear forces in a first section of the extruder may be greater than shear forces in an adjacent second section of the extruder downstream of the first section. In a post reaction section located after a point in which the crosslinking reaction has been completed, water may be added to improve die performance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECOSYNTHETIX LTD3900 COLLINS ROAD SUITE 1018 LANSING MI 48910

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bloembergen, Steven Okemos, US 36 268
Van, Egdom Edward Dunday, CA 4 16
Wildi, Robert H Parkersburg, US 7 94

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00