Kneading device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9662806
APP PUB NO 20150239151A1
SERIAL NO

14628863

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A kneading device includes: a preliminary kneading device that produces a preslurry by agitating a powder and a liquid introduced and transferring them while wetting the powder with the liquid; and a main kneading device that causes the powder to be uniformly dispersed in the preslurry supplied from the preliminary kneading device to produce a slurry. The main kneading device includes a gap defined by two conical surfaces that face each other with a predetermined distance therebetween and rotate relative to each other about their central axes. The slurry is produced by passing the preslurry through the gap. With the preliminary kneading device, the powder is dispersed in the liquid after conforming to the liquid, which suppress damage to the powder. The conditions of main kneading can be changed only by adjusting the gap, which facilitates the operation of changing the conditions of the main kneading.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JTEKT CORPORATION5-8 MINAMISEMBA 3-CHOME CHUO-KU OSAKA-SHI OSAKA 542-8502

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Takafumi Okazaki, JP 70 603
Fuse, Masaru Kashihara, JP 95 1155
Mio, Takumi Kariya, JP 33 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00