Tensile dielectric films using UV curing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9659769
SERIAL NO

10972084

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A highly tensile dielectric layer is generated on a heat sensitive substrate while not exceeding thermal budget constraints. Ultraviolet (UV) irradiation is used to produce highly tensile films to be used, for example, in strained NMOS transistor architectures. UV curing of as-deposited PECVD silicon nitride films, for example, has been shown to produce films with stresses of at least 1.65 E10 dynes/cm2. Other dielectric capping layer film materials show similar results. In transistor implementations, the stress from a source/drain region capping layer composed of such a film is uniaxially transferred to the NMOS channel through the source-drain regions to create tensile strain in the NMOS channel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NOVELLUS SYSTEMS INC4650 CUSHING PARKWAY FREMONT CA 94538

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carris, Michael Tigard, US 9 485
Chang, Sean Sunnyvale, US 114 1734
Ilcisin, Kevin Beaverton, US 4 57
Lu, Guangquan Fremont, US 3 20
Mordo, David Cupertino, US 15 834
Pandit, Mandar Wilsonville, US 5 808
Sims, James S Tigard, US 18 2868
Varadarajan, Bhadri Beaverton, US 14 1118

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00