Beam extraction slit structure and ion source

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9659749
APP PUB NO 20160111250A1
SERIAL NO

14885586

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A beam extraction slit structure includes a plasma chamber interior surface that is, in operation, in contact with a plasma; a plasma chamber exterior surface that faces an extraction electrode; and a slit surface part that forms a beam extraction slit between the plasma chamber interior surface and the plasma chamber exterior surface in the beam extraction direction. The slit surface part includes a plasma meniscus fixing part formed in an area of relatively higher plasma density in the slit longitudinal direction to fixingly maintain a plasma meniscus of the plasma and a plasma meniscus non-fixing part formed in an area of relatively lower plasma density in the slit longitudinal direction to movably maintain the plasma meniscus of the plasma in the beam extraction direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO HEAVY INDUSTRIES ION TECHNOLOGY CO LTD1-1 OSAKI 2-CHOME SHINAGAWA-KU TOKYO 141-6025

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sato, Masateru Ehime, JP 18 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00