Sling bow

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9658024
SERIAL NO

15357571

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments include a sling bow designed to shoot a projectile. The sling bow can include a handle; a first limb comprising a distal end and a proximal end, wherein the proximal end is coupled to the handle; a second limb comprising a distal end and a proximal end, wherein the proximal end is coupled to the handle; a drawstring comprising a first elastic portion, a second elastic portion, and a non-elastic portion between the first and second elastic portions, wherein a first end of the first elastic portion is coupled to the distal end of the first limb and a first end of the second elastic portion is coupled to the distal end of the second limb; a first drawstring guide, the first drawstring guide defines a first drawstring void; and a second drawstring guide, the second drawstring guide defines a second drawstring void. Other embodiments are also included herein.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PETERSON ARCHERY LLC1850 PRAIRIE STREET PRAIRIE DU SAC WI 53578

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Trpkovski, Paul Kailua Kona, US 94 1147

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00