Fluidic control burner for pulverous feed

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9657939
SERIAL NO

14390944

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A burner is provided for a pulverous feed material. The burner has a structure that integrates the burner with a reaction vessel, and has an opening that communicates with the interior of the reaction vessel. The burner also has a gas supply channel to supply reaction gas through the opening into the reaction vessel, and a feed supply for delivering pulverous material to the reaction vessel. The burner also has a fluidic control system having at least one port capable of directing a stream of fluid at an angle to the direction of flow of the reaction gas so as to modify the flow of the reaction gas. In addition, components are provided to modify the swirl intensity and turbulence intensity of the reaction gas independently of the exit velocity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HATCH LTDMISSISSAUGA ONTARIO L5K 2R7

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gonzales, Thomas W Tucson, US 4 5
Jastrzebski, Maciej Oakville, CA 17 41
Lamoureux, Alexandre Montréal, CA 2 8
Larrondo, Piña Javier Eduardo Providencia, CL 1 1
Mallory, Alan Barrie, CA 4 5
Marincic, Ivan Mississauga, CA 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00