Method for producing a tower construction from reinforced concrete

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9657494
APP PUB NO 20150292229A1
SERIAL NO

14438662

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for producing a tower construction (1) from reinforced concrete. A tower has at least one cavity (35) that extends in the longitudinal direction within the tower. Double-wall elements (2) are arranged along a periphery of the tower, each comprising an external plate (3) as well as an internal plate (4) in vertical or inclined position, forming vertical external joints (5) as well as vertical internal joints (6) between the external plates (3) and the internal plates (4). A reinforcement (9) is installed in the area of the vertical external joints (5) in-between the external plates (3) as well as the vertical internal joints (6) in-between the internal plates (4). The vertical external joints (5) and the vertical internal joints (6) in-between the double-wall elements (2) are closed and the double-wall elements (2) are filled with concrete (23).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECHNISCHE UNIVERSITAT WIENKARLSPLATZ 13 1040 WIEN 1040

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kollegger, Johann Klosterneuberg, AT 9 15
Schönweger, Maria Charlotte Vienna, AT 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00