Hydraulic circuit for construction machine and control device for same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9657461
SERIAL NO

14540226

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydraulic circuit for a construction machine including a center bypass passage including a group of directional control valves arranged in tandem; and a bleed-off valve arranged in the center bypass passage on a downstream side of the group, wherein each directional control valve includes a first internal passage causing the pressurized oil supplied to the directional control valve to flow out to the center bypass passage and a second internal passage supplying the pressurized oil to a cylinder port, wherein a parallel passage is formed by the center bypass passage and the first internal passage by causing the pressurized oil discharged from the hydraulic pump to flow to the center bypass passage on the downstream of the directional control valve, wherein the second internal passage supplies the pressurized oil from the center bypass passage through an opening of a spool and/or the bypass passage to the cylinder port.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO(S H I ) CONSTRUCTION MACHINERY CO LTDJAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hashimoto, Hirofumi Chiba, JP 21 218

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00