Hydrogen cavern pad gas management

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9656807
SERIAL NO

14468531

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of pad gas management in an underground storage volume including storing a first compressible fluid, determining a transient minimum operating pressure (Ptrans), measuring the pressure (Pact), removing at least a portion of the first compressible fluid, concurrently, introducing an incompressible fluid, thereby producing a transient pressure condition controlled by the flow rate of the incompressible fluid, such that Ptransact. The method may also include a length of casing, permanently cemented into the surrounding rock formations, with a final cemented casing shoe defining the practical endpoint at an approximate depth (Dcasing), determining a transient pressure gradient (Gtrans) for the underground storage volume, wherein Ptranscasing×Gtrans. The maximum removal of the first compressible fluid is controlled such that Pminact, and wherein the transient pressure condition has a duration (D) of less than 7 days, more preferably less than 5 days.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIR LIQUIDE LARGE INDUSTRIES U S LP2700 POST OAK BLVD SUITE 325 HOUSTON TX 77056

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dony, Azadeh Katy, US 2 7
Strybos, Ronald Kountze, US 25 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00