Vertical machining center

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9656363
SERIAL NO

15045254

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vertical machining center includes a base; a tilting rotary table, a tool spindle, a tilting shaft, a recessed area, a slide door, and an inner cover. The tilting rotary table is disposed on the base and configured to turn and tilt a table face of a rotary table. The tool spindle is rotatable about a vertical axis line and movable in an X axis direction, a Y axis direction, and a Z axis direction. The tilting shaft is disposed in the tilting rotary table and oriented in the Y axis direction. The recessed area is disposed on a front surface of the vertical machining center. The recessed area is adjacent to a support supporting the tilting shaft. The slide door is configured to cover the front surface. The inner cover is integral with the slide door. The inner cover is configured to cover the recessed area.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAMAZAKI MAZAK CORPORATION1-131 TAKEDA OGUCHI-CHO NIWA-GUN AICHI 480-0197

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nishida, Kiyoshi Niwa-gun, JP 10 540
Noda, Kazuhiro Niwa-gun, JP 123 1505
Toyoda, Takehiro Niwa-gun, JP 12 62

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00