Operational amplifier with current-controlled up or down hysteresis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9654086
SERIAL NO

14992426

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is an op-amp circuit with current-controlled hysteresis that is insensitive to PVT variations. In the circuit, a digital output signal is output from an output buffer based on the output voltage at an output node of an op-amp. A current source is connected to the input side of the op-amp or one of multiple current sources is selectively connected to the input side and enabled when the digital output signal has a high value to provide falling edge hysteresis. Alternatively, a current source is connected to the reference side of the op-amp or one of multiple current sources is selectively connected to the reference side and enabled when the digital output signal is low to provide rising edge hysteresis. Alternatively, current sources are connected to both the input and reference sides and selectively controlled to provide either falling or rising edge hysteresis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARVELL ASIA PTE LTDTAI SENG CENTRE 3 IRVING ROAD #10-01 SINGAPORE 369522

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fifield, John A Underhill, US 180 2700
Hunt-Schroeder, Eric D South Burlington, US 34 109

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00