Mask and method for forming the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9651857
SERIAL NO

14637189

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A photomask includes a low thermal expansion material (LTEM) substrate, a patterned opaque layer over the LTEM substrate, and a patterned capping layer over the opaque layer. The patterned capping layer includes a transition metal material for suppressing haze growth, such as metal oxide, metal nitride, or metal oxynitride. The material in the capping layer reacts with a hydrogenic compound from a lithography environment to for an atomic level hydrogen passivation layer. The passivation layer has superior ability to suppress photo-induced haze defect growth on the photomask surface, to improve production cycle time and reduce the production cost.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY LTDNO 8 LI-HSIN RD 6 SCIENCE-BASED INDUSTRIAL PARK HSIN-CHU 300-77 R O C

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chia-Jen Jhudong Township, Hsinchu County, TW 98 1413
Lee, Hsin-Chang Zhubei, Hsinchu County, TW 203 1090
Lien, Ta-Cheng Cyonglin Township, Hsinchu County, TW 104 198
Lin, Yun-Yue Hsinchu, TW 77 363
Yen, Anthony Hsinchu, TW 157 3414

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 16, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00