Sizing defect detection system and sizing defect detection method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9651500
APP PUB NO 20160123895A1
SERIAL NO

14895662

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A light emission part projects a laser light toward an edge portion of a formation. The laser light extends in a direction intersecting a conveyance direction of a forming belt. A light receiving part is opposed to the light emission part and located on the opposite side of the formation. The laser light passes through an area above an upper surface of the formation at least partially and is partially blocked by rising of the edge portion of the formation. A control device determines occurrence of the glue-joint failure on the basis of whether the quantity of light received by the light receiving part is reduced by at least a predetermined value or a predetermined rate, and provides or gives a visual display or a warning of the occurrence of glue-joint failure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YOSHINO GYPSUM CO LTDSHIN-TOKYO BLDG 3-1 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1000005 ?1000005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yamazaki, Masahiko Tokyo, JP 35 419

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 16, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00