Hybrid-cycle liquid propellant rocket engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9650995
SERIAL NO

14212397

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods are described herein for a hybrid liquid propellant rocket engine. In an embodiment, the engine includes a first pump powered by a first turbine, a second pump powered by a second turbine, and a gas generator. An output of the gas generator is connected to the first turbine and the second turbine. The engine further includes a third pump powered by a third turbine, a fourth pump powered by a fourth turbine, and a nozzle having an expander cycle in a wall and a combustion chamber. An output of the third pump is connected to the expander cycle and an output of the wall is connected to the third turbine and the fourth turbine. An output of the fourth pump, an output of the third turbine, and an output of the fourth turbine are connected to the combustion chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORTHROP GRUMMAN SYSTEMS CORPORATION2980 FAIRVIEW PARK DRIVE FALLS CHURCH VA 22042-4511

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Elias, Antonio L McLean, US 3 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 16, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00