Seamless steel pipe for hollow spring

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9650704
SERIAL NO

14407106

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A seamless steel pipe for a hollow spring includes C: 0.2 to 0.7 mass %, Si: 0.5 to 3 mass %, Mn: 0.1 to 2 mass %, Cr: 3 mass % or less (excluding 0 mass %), Al: 0.1 mass % or less (excluding 0 mass %), P: 0.02 mass % or less (excluding 0 mass %), S: 0.02 mass % or less (excluding 0 mass %) and N: 0.02 mass % or less (excluding 0 mass %). A residual austenite content in an inner surface layer part of the steel pipe is 5 vol. % or less. An average grain size of a ferrite-pearlite structure in the inner surface layer part of the steel pipe is 18 μm or less. A number density of a carbide having a circle equivalent diameter of 500 nm or more and being present in the inner surface layer part of the steel pipe is 1.8×10−2 particles/μm2 or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL LTD )10-26 WAKINOHAMA-CHO 2-CHOME CHUO-KU KOBE-SHI HYOGO 651-8585

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hatano, Hitoshi Hyogo, JP 12 433
Kochi, Takuya Hyogo, JP 31 118
Tamura, Eiichi Hyogo, JP 13 61
Toyotake, Kotaro Fukuoka, JP 13 61

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 16, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00