Metering the disposition of a food product into cavities forming a pellet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9648898
SERIAL NO

13614986

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for metering the disposition of a food product into cavities forming a pellet. The cavities are defined in a conveyor as individual cavities. Each cavity defines a specific volume. The process includes supplying a quantity of food product in a supply chamber which includes a plurality of nozzles aligned above the conveyor. The nozzles are aligned with a predetermined portion of the cavities. A predefined supply of food product is dispensed and metered through each nozzle. The food product is dispensed through the nozzles into the cavities without exceeding the specific volume of the cavity. The food product is frozen into an individual quick frozen pellet starting immediately upon disposition in one of the cavities. The step of metering the predefined amount of food product includes metering a predetermined weight of the food product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KERRY GROUP SERVICES INTERNATIONAL LIMITEDTRALEE CO KERRY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Strand, Aaron Plymouth, US 22 249

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 16, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00