Current control circuits

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9648682
SERIAL NO

15227232

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A current control circuit is provided for a driving circuit system of LEDs coupled in series. The driving circuit system includes a rectifier and current modules. In the current control circuit, a first voltage-division circuit divides an output voltage of the rectifier to obtain a first voltage. A first operational amplifier has a non-inverting input terminal receiving a reference voltage, an inverting input terminal coupled to a common output terminal, and an output terminal coupled to one terminal of a capacitor and a first input terminal of a multiplier. A first input terminal of the multiplier receives an output voltage of the first operational amplifier, and the second input terminal thereof receives the first voltage. The other terminal of the capacitor is coupled to the ground. One terminal of a resistor is coupled to the common output terminal, and the other terminal thereof is coupled to the ground.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRINCETON TECHNOLOGY CORPORATION2F NO 233-1 BAOQIAO RD SINDIAN DIST NEW TAIPEI CITY 23145

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhang, Sheng-You New Taipei, TW 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00