Adhesives for attaching wire network to photovoltaic cells

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9647160
APP PUB NO 20160190369A1
SERIAL NO

14616978

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are novel methods of fabricating photovoltaic modules using pressure sensitive adhesives (PSA) to secure wire networks of interconnect assemblies to one or both surfaces of photovoltaic cells. A PSA having suitable characteristics is provided near the interface between the wire network and the cell's surface. It may be provided together as part of the interconnect assembly or as a separate component. The interconnect assembly may also include a liner, which may remain as a part of the module or may be removed later. The PSA may be distributed in a void-free manner by applying some heat and/or pressure. The PSA may then be cured by, for example, exposing it to UV radiation to increase its mechanical stability at high temperatures, in particular at a, for example the maximum, operating temperature of the photovoltaic module. For example, the modulus of the PSA may be substantially increased during this curing operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BEIJING APOLLO DING RONG SOLAR TECHNOLOGY CO LTD3001 ROOM 6 BUILDING NO 7 RONGCHANG EAST STREET BEIJING ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE BEIJING DAXING DISTRICT 100176 CHINA BEIJING CITY BEIJING CITY 100176

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Krajewski, Todd Mountain View, US 35 366

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00