Checking the stoichiometry of I-III-VI layers for use in photovoltaic using improved electrolysis conditions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9647151
APP PUB NO 20130206233A1
SERIAL NO

13879703

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to manufacturing a I-III-VI compound in the form of a thin film for use in photovoltaics, including the steps of: a) electrodepositing a thin-film structure, consisting of I and/or III elements, onto the surface of an electrode that forms a substrate (SUB); and b) incorporating at least one VI element into the structure so as to obtain the I-III-VI compound. According to the invention, the electrodeposition step comprises checking that the uniformity of the thickness of the thin film varies by no more than 3% over the entire surface of the substrate receiving the deposition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELECTRICITE DE FRANCE22-30 AVENUE DE WAGRAM 75008 PARIS 75008

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahmed, Shafaat Yorktown Heights, US 40 177
De, Gasquet Philippe Rousset, FR 1 0
Deligianni, Hariklia Yorktown Heights, US 206 2300
Grand, Pierre-Philippe Rousset, FR 9 68
Huang, Qiang Yorktown Heights, US 254 2730
Jaime, Salvador Rousset, FR 2 1
Romankiw, Lubomyr T Yorktown Heights, US 99 2217
Vaidyanathan, Raman Yorktown Heights, US 16 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00