Barrier cable anchor rail

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9644392
SERIAL NO

14918289

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A barrier cable anchor rail assembly is disclosed. The assembly is adapted to be encapsulated in a concrete column and engage a plurality of cables to provide a barrier between successive columns of concrete. The assembly includes a first rail member and a plurality of threaded connectors. The threaded connectors are adapted to be engaged by a chuck that includes cable grippers adapted to engage one of the cables. The threaded connectors can be attached to the first rail member in the same orientation with a predetermined spacing between the central axis of the plurality of threaded connectors. The first rail member maintains the orientation and predetermined spacing of the threaded connectors and provides support to the concrete column in which it is encapsulated. A barrier cable assembly adapted to form a barrier between a first concrete column and a second concrete column is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL TECHNOLOGIES INC13022 TRINITY DRIVE STAFFORD TX 77477

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Landry, Stanley A Euless, US 6 85

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00