Method for producing transgenic plant with increase syringin production and plant produced by using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9644191
APP PUB NO 20150252338A1
SERIAL NO

14435445

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to recombinant glycosyl transferase UGT72E3/2 gene having an excellent syringin synthesis ability based on remarkable enzyme specificity for sinapyl alcohol, a method for producing a transgenic plant with increased syringin production based on a metabolic process which uses F5H and CHS genes that are involved with the phenylpropanoid biosynthesis pathway and Myb58 gene as a transcription factor for positive regulation of the gene that is involved with lignin biosynthesis pathway, and a plant obtained by the method. According to the present invention, syringin with various pharmaceutical applications can be effectively produced in a large amount in a plant, and thus it is expected to allow the development of an industry relating to agrobiological materials that are highly valuable as foods or pharmaceuticals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DONG-A UNIVERSITY RESEARCH FOUNDATION FOR INDUSTRY-ACADEMY COOPERATIONSAHA-GU BUSAN 604-714

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chu, Yang Busan, KR 12 22
Kwon, Tack Min Busan, KR 1 0
Nam, Jae Sung Busan, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00