Method for making super-hard constructions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9643334
APP PUB NO 20150097321A1
SERIAL NO

14394752

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making a construction comprising a polycrystalline super-hard structure joined to a side surface of an elongate substrate. The method includes: providing a vessel configured for an ultra-high pressure, high temperature furnace, the vessel having an elongate cavity for containing a pre-sinter assembly and defining a longitudinal axis, the cavity having opposite ends connected by a cavity wall. The pre-sinter assembly comprises the substrate, an aggregation comprising a plurality of super-hard grains arranged over at least a part of the side surface of the substrate, and a spacer structure configured for spacing the substrate apart from the cavity wall. The spacer structure comprises material having a Young's modulus of at least 300 GPa. The method further includes inserting the pre-sinter assembly into the cavity, the substrate being substantially longitudinally aligned and the spacer structure arranged between the side surface of the substrate and the cavity wall; applying a force to the pre-sinter assembly and heating it to a temperature, the force being sufficient to generate a pressure within the vessel for sintering the aggregation at the temperature, and providing the construction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELEMENT SIX (PRODUCTION) (PTY) LTDDEBID ROAD NUFFIELD SPRINGS 1559

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barry, John James Clare, IE 15 114
Choenyane, Leshope Joseph Springs, ZA 1 6
Kasonde, Maweja Didcot, GB 29 142
Radebe, Erens Tshepo Springs, ZA 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00