Access node and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9641659
SERIAL NO

14968761

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An all-encompassing fully integrated communication Access Node for call stations and other security and communications equipment includes a modular housing within which is mounted wire and wireless communication systems and power systems. The housing has a chassis for mounting the electronics and battery modules and a backbox and panel for staged installations, managing cables and providing heat dissipation. A door to the chassis is secured using latch hooks with roller bearings. Optical cable termination is provided as a two sided patch panel. Dual power supplies provide power to internal components and to external components via a distribution module. Backup power is provided by a custom battery backup with a charging controller. Cooling is controlled by dual fans and a fan controller moving air through the housing using openings and baffles. Freestanding pedestal mounting of the Access Node and various other mounts for column, wall, or ceiling to any substrate or condition is an option. Venting through a plug prevents pressure build up.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOYCE TECHNOLOGIES40 WALL STREET 25TH FLOOR NEW YORK NY 10005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boyce, Charles New York, US 10 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00