Power converter output stage using heat dissipating bus bars

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9641095
SERIAL NO

14625120

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dense and efficient output stage for a DC/DC converter includes center tapped secondary windings of a transformer having an offset core with respect to a PCB, two pairs of synchronous rectifiers configured to define two pairs of paralleled symmetrical AC loops respective to the secondary windings, and at least two bus bars disposed within a forced cooling airstream to act as heat sinks for the synchronous rectifiers, while further providing a filtering impedance between the transformer windings and an output capacitance. A split capacitance is disposed in close proximity with the synchronous rectifiers to filter out ripple current, in one embodiment characterized by first and second capacitors each respectively coupled between opposing ends of the first and second bus bars, wherein the bus bars are arranged about at least three sides of the transformer core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BEL POWER SOLUTIONS INC152 N THIRD STREET SUITE 805 SAN JOSE CA 95112

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Feno, Ivan Bertschikon, CH 10 82
Wild, Urs Bäretswil, CH 5 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00