Fan motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9641041
APP PUB NO 20150180300A1
SERIAL NO

14415597

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fan motor according to the present invention includes a lower bracket having a center portion through which a rotating shaft passes, a bracket welding groove formed at an upper portion, and a lower bearing insertion space formed around the rotating shaft outside the center portion; an upper bracket having a center portion through which the rotating shaft passes, a bracket welding projection formed at a position corresponding to the bracket welding groove of the lower bracket, and an upper bearing insertion space formed around the rotating shaft inside the center portion; a rotor combined with the rotating shaft and rotating inside the upper bracket; and a stator positioned around the rotor, and the bracket welding groove and the bracket welding projection are tightly coupled to each other through ultrasonic welding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEW MOTECH CO LTD#270-65 OSEON-DONG GWANGSAN-GU GWANGJU 506-253

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jang, Jeong Cheol Gwangju, KR 83 319
Park, Gyeong Su Gwangju, KR 15 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00