Semiconductor device and method of forming a power MOSFET with interconnect structure to achieve lower RDSON

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9640638
APP PUB NO 20130134598A1
SERIAL NO

13746826

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device has a substrate and gate structure over the substrate. A source region is formed in the substrate adjacent to the gate structure. A drain region in the substrate adjacent to the gate structure opposite the source region. An interconnect structure is formed over the substrate by forming a conductive plane electrically connected to the source region, and forming a conductive layer within openings of the conductive plane and electrically connected to the drain region. The interconnect structure can be formed as stacked conductive layers laid out in alternating strips. The conductive plane extends under a gate terminal of the semiconductor device. An insulating layer is formed over the substrate and a field plate is formed in the insulating layer. The field plate is electrically connected the source terminal. A stress relief layer is formed over a surface of the substrate opposite the gate structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GREAT WALL SEMICONDUCTOR CORPORATIONP O BOX 24619 TEMPE AS 85285

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Samuel J Tempe, US 61 505
Okada, David N Chandler, US 27 399
Shea, Patrick M Oviedo, US 22 523

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00