Systems and methods for minimizing energy costs for a power consumption system that has access to off-grid resources

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9639904
SERIAL NO

13836253

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes: calculating a load prediction arising from an power consumption entity over a prospective time period; calculating a predicted off-grid power supply from an off-grid power supply; minimizing, for a respective time interval, a calculated amount of electrical-power to import from a power grid, in accordance with output from a cost function; and, for at least one interval, importing, from the power grid, the corresponding calculated amount of electrical-power corresponding to the at least one interval. The cost function uses: (i) a multi-component time of use tariff schedule associated with the power grid that includes a first power rate during a prospective time period and second power rate during a second time period, (ii) the load prediction over the prospective time period, (iii) the predicted off-grid electrical-power supply over the prospective time period, (iv) a state of a rechargeable battery.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OPTERRA ENERGY SERVICES LLC12980 FOSTER STREET SUITE 400 OVERLAND PARK KS 66213

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alegria, Eduardo Alberto San Mateo, US 3 44
Idrees, Osama Mohammed San Jose, US 1 20
Potter, David Sterling San Francisco, US 3 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00