Patterned phase difference film and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9638848
APP PUB NO 20140268002A1
SERIAL NO

14351346

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pattern phase difference film is manufactured by a process including a laminate body formation step of applying a pattern alignment layer composition on a substrate to form a laminate body, a heat-drying layer formation step of heat-drying the composition to form a heat-dried layer, a pattern alignment layer formation step of irradiating a polarization pattern onto the heat-dried layer to form a pattern alignment layer, and a phase difference layer formation step of forming a phase difference layer including a rod-shaped compound on the pattern alignment layer. During the steps between the heat-drying layer formation step and the phase difference layer formation step, the heat-dried layer and the pattern alignment layer are exposed to the air for four hours or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAI NIPPON PRINTING CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuda, Masanori Tokyo, JP 31 127
Inomata, Yuya Tokyo, JP 11 79
Kambara, Kumiko Tokyo, JP 12 3
Kashima, Keiji Tokyo, JP 98 1401
Usuki, Hideki Tokyo, JP 21 141
Yamada, Kazuki Tokyo, JP 69 754

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00