Computer-implemented system and method for generating a risk-adjusted probabilistic forecast of renewable power production for a fleet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9638831
SERIAL NO

14139007

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Probabilistic forecasts of the expected power production of renewable power sources, such as solar and wind, are generally provided with a degree of uncertainty. The expected power production for a fleet can be projected as a time series of power production estimates over a time period ahead of the current time. The uncertainty of each power production estimate can be combined with the costs and risks associated with power generation forecasting errors, and displayed or visually graphed as a single, deterministic result to assist power grid operators (or planners) in deciding whether to rely on the renewable power source.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CLEAN POWER RESEARCH, L.L.C.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoff, Thomas E Napa, US 90 292

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00