Turbine bucket having non-axisymmetric base contour

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9638041
APP PUB NO 20150110629A1
SERIAL NO

14061221

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments of the invention include turbine buckets and systems employing such buckets. Various particular embodiments include a turbine bucket having: an airfoil having: a suction side; a pressure side opposing the suction side; a leading edge spanning between the pressure side and the suction side; and a trailing edge opposing the leading edge and spanning between the pressure side and the suction side; and a base connected with a first end of the airfoil along the suction side, pressure side, trailing edge and the leading edge, the base including a non-axisymmetric contour proximate a junction between the base and the airfoil.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brozyna, Lee Larned Mauldin, US 7 67
Collier, Matthew Durham Simpsonville, US 9 121
Kester, Christopher William Greenville, US 5 46
Stein, Alexander Simpsonville, US 127 1151

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00