Power transmission device and hybrid construction machine provided therewith

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9637890
APP PUB NO 20150090506A1
SERIAL NO

14387436

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A configuration is provided to directly utilize the power of an engine as the power of a hydraulic pump, and to efficiently perform power generation and engine assist. The configuration is provided with an engine; a generator which is configured to generate electric power by an operation of the generator using the power of the engine; a battery which is configured to store the electric power generated by the generator; a motor which is configured to be operated by the power of the engine and by the electric power of the battery; a hydraulic pump connected to the motor so as to be driven by operation of the motor; and a power divider connected to the engine, the generator, and the motor so that the power of the engine is distributed to the generator and to the motor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOBELCO CONSTRUCTION MACHINERY CO LTDHIROSHIMA COUNTY HIROSHIMA JAPAN HIROSHIMA-SHI HIROSHIMA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirozawa, Mitsunori Hiroshima, JP 15 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00