Emulsifier and production method therefor, and production method for emulsion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9637559
APP PUB NO 20130253077A1
SERIAL NO

13822910

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are an emulsifier derived from sugar polymer capable of successfully emulsifying even unsaturated oil, a production method therefore, and a production method for emulsion using the emulsifier. This emulsifier can be obtained by a production method including an emulsification improving step of improving the emulsification of sugar polymer particles dispersed in water. In this emulsification improving step, the emulsification of sugar polymer particles can be improved by an action of an emulsification aid that is at least water-soluble one kind selected from salts, an amphiphilic agent, saccharides, an organic acid, and an amino acid. Alternatively, the emulsification of sugar polymer particles can be improved by storing the sugar polymer particles dispersed in water at a low temperature of 10° C. or lower.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KANAGAWA UNIVERSITY3-27-1 ROKKAKUBASHI KANAGAWA-KU YOKOHAMA-SHI KANAGAWA 2218686

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imai, Yoko Kanagawa, JP 16 143
Tajima, Kazuo Kanagawa, JP 17 109
Toyoda, Kaori Kanagawa, JP 15 93

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00