Method for hot rolling Z-sections sheet piles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9636724
APP PUB NO 20150052961A1
SERIAL NO

14389986

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for rolling a Z-section sheet pile comprises rolling a curved preform of a web (16) in successive roll gaps defined by at least one roll pair comprising a grooved upper roll (26) and a grooved lower roll (28), wherein: a first corner (18) and an adjoining first part of the curved preform of the web (16) are formed in a first groove (42) of an upper roll (26); and a second corner (20) and an adjoining second part of the curved preform of the web (16) are formed in a first groove (46) of a lower roll (28). In the last roll gaps forming the curved preform of the web (16), the diameter of the lower roll (28) decreases in a discontinuous manner in the interval between the first groove (42) in the upper roll (26) and the first groove (46) in the lower roll (26), and the diameter of the upper roll (26) increases in this interval in a complementary manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARCELORMITTAL INVESTIGACION Y DESARROLLO S LSESTAO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hermes, Aloyse Differdange, LU 4 25
Robinet, François Lottert, BE 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00